Kairos Power website screenshot

Kairos Power

Kairos Power is an Alameda, California-based advanced nuclear fission company developing the KP-FHR (Kairos Power Fluoride salt-cooled High-temperature Reactor), a Generation IV reactor design that uses TRISO (tri-structural isotropic) fuel pebbles cooled by molten fluoride salt (FLiBe) at low pressure and high temperature. Kairos Power is building Hermes, a low-power demonstration reactor at the East Tennessee Technology Park in Oak Ridge, Tennessee, which became the first non-light-water reactor authorized for construction by the U.S. Nuclear Regulatory Commission in over 50 years (construction permit issued December 2023). A second unit, Hermes 2, will pair two reactors with a 28 MWe electricity-generating turbine. In October 2024 Google signed a corporate power purchase agreement with Kairos Power for up to 500 MW of nuclear electricity from multiple small modular reactors, with the first deployment targeted by 2030 and additional capacity through 2035 — the first corporate PPA for new advanced nuclear in the United States. The company's revenue model is reactor sales, electricity PPAs, and federal cost-share partnerships (DOE Advanced Reactor Demonstration Program). Kairos Power is privately held, does not expose a public developer API or SDK, and operates under NRC regulatory oversight as a safety-critical nuclear licensee.

Kairos Power is profiled on the APIs.io network. Tagged areas include Nuclear, Advanced Nuclear, Nuclear Fission, Small Modular Reactor, and Generation IV.

Kairos Power’s developer surface includes product news, GitHub presence, YouTube channel, and 10 more developer resources.

7.4/100 minimal ▬ flat Agent 0/100 human only Full breakdown ↓
scored 2026-07-27 · rubric v0.5
0 APIs
NuclearAdvanced NuclearNuclear FissionSmall Modular ReactorGeneration IVKP-FHRFluoride SaltTRISO FuelHermes ReactorEnergyClean EnergyPower GenerationHyperscaler Power

Kin Score

Kin Score Kin Score How this is scored →
scored 2026-07-27 · rubric v0.5
Composite quality — 7.4/100 · minimal
Contract Quality 0.0 / 25
Developer Ergonomics 0.0 / 20
Commercial Clarity 0.0 / 20
Operational Transparency 0.7 / 13
Governance 0.0 / 12
Discoverability 6.8 / 10
Agent readiness — 0/100 · human only
Machine-Readable Contract 0 / 18
Agentic Access Contract 0 / 15
MCP Server 0 / 12
Machine-Readable Auth 0 / 10
Idempotency 0 / 9
Stable Error Semantics 0 / 8
Request/Response Examples 0 / 7
Rate-Limit Signaling 0 / 7
Typed Event Surface 0 / 6
Agent Skills 0 / 5
Well-Known Catalog 0 / 4
Consent & Bot Identity 0 / 3
Improve this rating by publishing the missing artifacts — every area above can be raised, and the full rubric is at apis.io/rating/. This rating is computed from github.com/api-evangelist/kairos-power: open an issue to ask a question, or submit a pull request to add artifacts. Want it done for you? Prioritized profiling — $2,500 →

Security Posture 1

Authentication, domain security, vulnerability disclosure, and trust-center signals.

Kairos Power Domain Security

TLSv1.3 · HSTS · DMARC

SECURITY

Resources

Build 1

SDKs, sample code, and the tooling you integrate with

Access & Security 1

Authentication, authorization, and security posture

Learn 1

Tutorials, courses, talks, and written guidance

Operate 1

Status, limits, changes, and where to get help

Company 5

The organization behind the API

Other 4

Properties that don't map to a standard resource type

Source (apis.yml)

apis.yml Raw ↑
aid: kairos-power
name: Kairos Power
description: Kairos Power is an Alameda, California-based advanced nuclear fission company developing the KP-FHR (Kairos Power
  Fluoride salt-cooled High-temperature Reactor), a Generation IV reactor design that uses TRISO (tri-structural isotropic)
  fuel pebbles cooled by molten fluoride salt (FLiBe) at low pressure and high temperature. Kairos Power is building Hermes,
  a low-power demonstration reactor at the East Tennessee Technology Park in Oak Ridge, Tennessee, which became the first
  non-light-water reactor authorized for construction by the U.S. Nuclear Regulatory Commission in over 50 years (construction
  permit issued December 2023). A second unit, Hermes 2, will pair two reactors with a 28 MWe electricity-generating turbine.
  In October 2024 Google signed a corporate power purchase agreement with Kairos Power for up to 500 MW of nuclear electricity
  from multiple small modular reactors, with the first deployment targeted by 2030 and additional capacity through 2035 —
  the first corporate PPA for new advanced nuclear in the United States. The company's revenue model is reactor sales, electricity
  PPAs, and federal cost-share partnerships (DOE Advanced Reactor Demonstration Program). Kairos Power is privately held,
  does not expose a public developer API or SDK, and operates under NRC regulatory oversight as a safety-critical nuclear
  licensee.
type: Index
accessModel:
  pricing: unknown
  onboarding: unknown
  trial: false
  try_now: false
  public: false
  label: Unknown
  confidence: low
  source: []
  generated: '2026-07-22'
  method: derived
position: Provider
access: 3rd-Party
image: https://kinlane-images.s3.amazonaws.com/shared/apis-json/icons/kairos-power.png
tags:
- Nuclear
- Advanced Nuclear
- Nuclear Fission
- Small Modular Reactor
- Generation IV
- KP-FHR
- Fluoride Salt
- TRISO Fuel
- Hermes Reactor
- Energy
- Clean Energy
- Power Generation
- Hyperscaler Power
url: https://raw.githubusercontent.com/api-evangelist/kairos-power/refs/heads/main/apis.yml
created: '2026-05-24'
modified: '2026-05-24'
specificationVersion: '0.20'
apis: []
common:
- type: DomainSecurity
  url: security/kairos-power-domain-security.yml
- type: Website
  url: https://kairospower.com
- type: Technology
  url: https://kairospower.com/technology/
- type: Hermes
  url: https://kairospower.com/hermes/
- type: Company
  url: https://kairospower.com/about/
- type: Team
  url: https://kairospower.com/team/
- type: News
  url: https://kairospower.com/external_updates/
- type: Careers
  url: https://kairospower.com/careers/
- type: Contact
  url: https://kairospower.com/contact/
- type: GitHub
  url: https://github.com/Kairos-Power
- type: LinkedIn
  url: https://www.linkedin.com/company/kairos-power
- type: Twitter
  url: https://twitter.com/KairosPower
- type: YouTube
  url: https://www.youtube.com/@KairosPower
maintainers:
- FN: Kin Lane
  email: kin@apievangelist.com