Construction & Field Delivery Management
Site execution of infrastructure works, spanning site establishment and mobilisation, work-front and production management, temporary works, plant and equipment, site materials and logistics, and construction quality. The field-delivery discipline that turns design and programme into constructed works safely, productively, and to specification.
Construction & Field Delivery Management (BC-5040) is a level-1 business capability in the Infrastructure model. The catalog holds 6 API surface(s) from 5 provider(s) that can perform some part of it, 2 of them rated strong or better. Reach is the vendor surface that lands on this capability — it is not a claim about what any particular organisation has deployed.
Authorities this capability cites
Cited by the capability model itself. These frameworks are referenced, never redistributed, and citing one does not imply its owner endorses this listing.
- https://www.iso.org/iso-45001-occupational-health-and-safety.html
- https://www.buildingsmart.org/
- https://www.iso.org/iso-9001-quality-management.html
- https://www.hse.gov.uk/construction/cdm/2015/index.htm
Sub-capabilities
Site Establishment & Mobilisation BC-5040.10
Setup and mobilisation of the construction site, including compounds, temporary facilities, and connection of utilities and services.
Work Front & Production Management BC-5040.20
Planning, coordination, and tracking of construction production across active work fronts to sustain progress and productivity.
Temporary Works Management BC-5040.30
Management of temporary works and access systems that enable safe construction of the permanent works.
Plant & Equipment Management BC-5040.40
Provision, deployment, and upkeep of construction plant and equipment, including lifting operations.
Site Materials & Logistics BC-5040.50
Delivery, storage, and movement of construction materials on site, including logistics and waste.
Construction Quality Management BC-5040.60
Assurance and control of construction quality to deliver works that conform to specification.
Providers that reach this capability
Ordered by rating band. Reach means a provider publishes an API surface that can perform some part of this capability — it is not a claim that any particular organisation has deployed it.
Developing 1 Usable, with meaningful gaps to close
Thin 1 Limited public surface area
Emerging 1 Early or largely undocumented
Workflows that realise this capability
Arazzo workflows whose own sourceDescriptions call APIs that carry this
capability. The link is derived, not asserted: each workflow declares
x-realizes-capability-ids with the spec and confidence behind it.
- Autodesk Open, Comment On, and Close a BIM 360 Issue
— autodesk
· Construction Quality Management
BC-5040.60