Optimizely · OpenAPI Overlay 1.0.0

API Evangelist conversational phrasing for Optimizely CMP Open API Documentation Milestones API

5 actions 5 updates phrasing extends openapi/optimizely-milestones-api-openapi.yml
Generated by API Evangelist Written by API Evangelist tooling for Optimizely's API. It is a proposal applied on top of the contract, not a document Optimizely publishes.
View Overlay File View on GitHub Overlay Specification

What the actions change

x-apievangelist-phrasing

Targets 5

$.info
$.paths['/milestones'].get
$.paths['/milestones'].post
$.paths['/milestones/{id}'].get
$.paths['/milestones/{id}'].patch

OpenAPI Overlay

Raw ↑
# Generated by API Evangelist (build-phrasing.py). Our phrasing, not observed demand.
overlay: 1.0.0
info:
  title: API Evangelist conversational phrasing for Optimizely CMP Open API Documentation Milestones API
  version: 1.0.0
extends: openapi/optimizely-milestones-api-openapi.yml
actions:
- target: $.info
  update:
    x-apievangelist-phrasing:
      method: generated
      generated: '2026-09-26'
      generator: build-phrasing.py
      label: Generated by API Evangelist
      operations: 4
- target: $.paths['/milestones'].get
  update:
    x-apievangelist-phrasing:
      intent: List campaign milestones
      effect: read
      questions:
      - Which milestones are coming due in my Optimizely campaign?
      - Can I list only milestones due between two dates?
      - How do I page through milestones for one campaign?
      instructions:
      - text: List milestones for campaign {campaign_id}.
        slots:
          campaign_id: query.campaign_id
      - text: Show milestones due between {due_date__from} and {due_date__to}.
        slots:
          due_date__from: query.due_date__from
          due_date__to: query.due_date__to
      method: generated
      generated: '2026-09-26'
- target: $.paths['/milestones'].post
  update:
    x-apievangelist-phrasing:
      intent: Create a campaign milestone
      effect: write
      questions:
      - How do I add a milestone with a due date and colored label to a campaign?
      - Can I attach tasks to a new milestone, and must they belong to the same campaign?
      instructions:
      - text: Create milestone {title} due {due_date} with label color {hex_color}.
        slots:
          title: requestBody.title
          due_date: requestBody.due_date
          hex_color: requestBody.hex_color
      - text: Add milestone {title} to campaign {campaign_id}, due {due_date}, color {hex_color}, with tasks {tasks}.
        slots:
          title: requestBody.title
          campaign_id: requestBody.campaign_id
          due_date: requestBody.due_date
          hex_color: requestBody.hex_color
          tasks: requestBody.tasks
      method: generated
      generated: '2026-09-26'
- target: $.paths['/milestones/{id}'].get
  update:
    x-apievangelist-phrasing:
      intent: Get a milestone
      effect: read
      questions:
      - What's the due date and task list on a particular milestone?
      - Can I look up one milestone by its ID?
      instructions:
      - text: Show milestone {id}.
        slots:
          id: path.id
      - text: Get the details of milestone {id}.
        slots:
          id: path.id
      method: generated
      generated: '2026-09-26'
- target: $.paths['/milestones/{id}'].patch
  update:
    x-apievangelist-phrasing:
      intent: Update a milestone
      effect: write
      questions:
      - Can I push back a milestone's due date without changing anything else?
      - What happens to linked tasks if I send an empty task list when editing a milestone?
      instructions:
      - text: Move milestone {id} due date to {due_date}.
        slots:
          id: path.id
          due_date: requestBody.due_date
      - text: Rename milestone {id} to {title} and change its label color to {hex_color}.
        slots:
          id: path.id
          title: requestBody.title
          hex_color: requestBody.hex_color
      method: generated
      generated: '2026-09-26'