Distributed Energy Resource Management

BC-3840 Level 1 Power & Water Utilities 10 providers 29 API surfaces 7 rated strong or better

Onboarding, aggregation, and operational coordination of distributed energy resources connected to the distribution grid — rooftop solar, behind-the-meter storage, demand response, EV charging, and microgrids — and their participation in wholesale and flexibility markets.

Distributed Energy Resource Management (BC-3840) is a level-1 business capability in the Power & Water Utilities model. The catalog holds 29 API surface(s) from 10 provider(s) that can perform some part of it, 7 of them rated strong or better. Reach is the vendor surface that lands on this capability — it is not a claim about what any particular organisation has deployed.

Where this capability definition comes from. This capability is part of a published business-architecture model that API Evangelist did not author. It is redistributed here under CC-BY-4.0. Turbo EA Capabilities by Vincent Verdet — Turbo EA, https://github.com/vincentmakes/turbo-ea-capabilities, CC BY 4.0 Changes: Consolidated from 333 per-L1 YAML files into one JSON; English only (upstream i18n/ omitted); descriptions whitespace-normalised. No capability was added, removed, renamed or re-parented. Source repository · NOTICE and third-party framework attributions

Authorities this capability cites

Cited by the capability model itself. These frameworks are referenced, never redistributed, and citing one does not imply its owner endorses this listing.

Sub-capabilities

DER Registration & Onboarding BC-3840.10

Registration of distributed energy resources, technical qualification, and connection acceptance under IEEE 1547 / EU Requirements for Generators rules.

3 providers, 5 API surfaces

Virtual Power Plant Operations BC-3840.20

Aggregation and dispatch of distributed resources as a single operating entity into wholesale and balancing markets.

2 providers, 2 API surfaces

Demand Response Operations BC-3840.30

Recruitment, dispatch, and settlement of demand-side response programmes for residential, commercial, and industrial customers.

6 providers, 7 API surfaces

EV Grid Integration Management BC-3840.40

Management of electric-vehicle charging interaction with the grid including managed charging, V2G, and EV-specific tariffs.

3 providers, 4 API surfaces

Behind-the-Meter Storage Coordination BC-3840.50

Coordination of behind-the-meter battery storage participation in utility programmes and grid services.

1 provider, 1 API surface

DER Forecasting BC-3840.60

Short-term forecasting of distributed generation and flexible load contributing to system-operator and market schedules.

2 providers, 2 API surfaces

Microgrid Operations BC-3840.70

Operation of utility and customer microgrids including grid-tied and islanded modes and seamless transition control.

no catalog coverage

Providers that reach this capability

Ordered by rating band. Reach means a provider publishes an API surface that can perform some part of this capability — it is not a claim that any particular organisation has deployed it.

Exemplar 1 Complete, well-documented, and agent-ready
Strong 6 Solid coverage with minor gaps
Developing 3 Usable, with meaningful gaps to close

Workflows that realise this capability

Arazzo workflows whose own sourceDescriptions call APIs that carry this capability. The link is derived, not asserted: each workflow declares x-realizes-capability-ids with the spec and confidence behind it.

This page carries no rating. Capabilities are not rated. A capability is a description of what a business does, not a thing a company publishes, so a Kin Score would have nothing to measure.
The edge table is a Pro feature. This page shows which providers and tags reach Distributed Energy Resource Management. The underlying tag → capability edges — each with the quoted fragment of the provider's own OpenAPI that evidences it, a calibrated confidence score, and the contract-provenance gate it passed — are available through the API, along with company-level capability maps. Only edges at confidence ≥ 0.7 with evidence found verbatim in the source contract are published at all.

See plans →  ·  How the edges are graded →