Drata · OpenAPI Overlay 1.0.0

API Evangelist conversational phrasing for Drata Risk Registers API

6 actions 6 updates phrasing extends openapi/drata-risk-registers-api-openapi.yml
Generated by API Evangelist Written by API Evangelist tooling for Drata's API. It is a proposal applied on top of the contract, not a document Drata publishes.
View Overlay File View on GitHub Overlay Specification

What the actions change

x-apievangelist-phrasing

Targets 6

$.info
$.paths['/risk-registers'].get
$.paths['/risk-registers'].post
$.paths['/risk-registers/{riskRegisterId}'].get
$.paths['/risk-registers/{riskRegisterId}'].put
$.paths['/risk-registers/{riskRegisterId}'].delete

OpenAPI Overlay

Raw ↑
# Generated by API Evangelist (build-phrasing.py). Our phrasing, not observed demand.
overlay: 1.0.0
info:
  title: API Evangelist conversational phrasing for Drata Risk Registers API
  version: 1.0.0
extends: openapi/drata-risk-registers-api-openapi.yml
actions:
- target: $.info
  update:
    x-apievangelist-phrasing:
      method: generated
      generated: '2026-09-26'
      generator: build-phrasing.py
      label: Generated by API Evangelist
      operations: 5
- target: $.paths['/risk-registers'].get
  update:
    x-apievangelist-phrasing:
      intent: List risk registers
      effect: read
      questions:
      - Which risk registers exist in our account?
      - Can I filter risk registers by owner or workspace?
      instructions:
      - text: List risk registers named like {name}.
        slots:
          name: query.name
      - text: Show risk registers owned by users {ownerIds}.
        slots:
          ownerIds: query.ownerIds[]
      - text: List risk registers for workspaces {workspaceIds}.
        slots:
          workspaceIds: query.workspaceIds[]
      method: generated
      generated: '2026-09-26'
- target: $.paths['/risk-registers'].post
  update:
    x-apievangelist-phrasing:
      intent: Create a risk register
      effect: write
      questions:
      - How do I create a new risk register?
      - Can I assign owners and workspaces when creating a register?
      instructions:
      - text: Create a risk register named {name}.
        slots:
          name: requestBody.name
      - text: Create risk register {name} owned by {ownerIds} for workspaces {workspaceIds}.
        slots:
          name: requestBody.name
          ownerIds: requestBody.ownerIds
          workspaceIds: requestBody.workspaceIds
      method: generated
      generated: '2026-09-26'
- target: $.paths['/risk-registers/{riskRegisterId}'].get
  update:
    x-apievangelist-phrasing:
      intent: Get a risk register
      effect: read
      questions:
      - What are the details of one risk register?
      - Who owns a particular risk register?
      instructions:
      - text: Get risk register {riskRegisterId}.
        slots:
          riskRegisterId: path.riskRegisterId
      - text: Show the owners and details of risk register {riskRegisterId}.
        slots:
          riskRegisterId: path.riskRegisterId
      method: generated
      generated: '2026-09-26'
- target: $.paths['/risk-registers/{riskRegisterId}'].put
  update:
    x-apievangelist-phrasing:
      intent: Update a risk register
      effect: write
      questions:
      - How do I rename a risk register?
      - Can I change which workspaces a register is linked to?
      instructions:
      - text: Rename risk register {riskRegisterId} to {name}.
        slots:
          riskRegisterId: path.riskRegisterId
          name: requestBody.name
      - text: Set the owners of risk register {riskRegisterId} to {ownerIds}.
        slots:
          riskRegisterId: path.riskRegisterId
          ownerIds: requestBody.ownerIds
      method: generated
      generated: '2026-09-26'
- target: $.paths['/risk-registers/{riskRegisterId}'].delete
  update:
    x-apievangelist-phrasing:
      intent: Delete a risk register
      effect: destructive
      questions:
      - Can I delete a risk register we no longer use?
      - What's needed to remove a whole risk register?
      instructions:
      - text: Delete risk register {riskRegisterId}.
        slots:
          riskRegisterId: path.riskRegisterId
      - text: Remove the entire risk register {riskRegisterId}.
        slots:
          riskRegisterId: path.riskRegisterId
      method: generated
      generated: '2026-09-26'

Work with this as data

Every overlay here is available over the APIs.io API and to AI agents over MCP.

MCP server

One button, every client — Claude, Cursor, VS Code and the rest.

https://apis.io/mcp

Tools for openapi overlays

4 MCP tools reach this
  • find_overlaysBrowse and filter every overlay in the catalog.
  • apis_io_searchSTART HERE — APIs, providers and tags for one query, each with its total.
  • resolveTurn a domain, URL or GitHub org into the provider it belongs to.
  • find_cohortsEvery scored population of providers in the catalog.
All 92 tools →

Call it yourself

curl for this page
This overlay
curl "https://apis.io/api/v1/overlays/drata-risk-registers-api-phrasing-overlay"
All openapi overlays
curl "https://apis.io/api/v1/overlays?limit=25"

Calls without X-API-Key need no key. Calls with it need a paid plan — get a key.

Get an API key

Free tier, no form to fill in. Signing in shares your email address with us — we store it to create your key and to recognise you if you sign in with another provider. See our Privacy Policy and Terms.

A second provider on the same verified email joins the account you already have.