Fulcrumpro Change Order API
The Change Order API from Fulcrumpro — 3 operation(s) for change order.
The Change Order API from Fulcrumpro — 3 operation(s) for change order.
Every API here is available over the APIs.io API and to AI agents over MCP.
One button, every client — Claude, Cursor, VS Code and the rest.
https://apis.io/mcp
find_apisBrowse and filter every API in the catalog.get_api_artifactsOne API's artifacts, grouped by type.get_openapiThe primary OpenAPI for this API.find_similar_apisAPIs that look like this one.apis_io_searchSTART HERE — APIs, providers and tags for one query, each with its total.resolveTurn a domain, URL or GitHub org into the provider it belongs to.find_cohortsEvery scored population of providers in the catalog.curl "https://apis.io/api/v1/apis/fulcrumpro:fulcrumpro-change-order-api"
curl "https://apis.io/api/v1/apis?limit=25"
Calls without X-API-Key need no key. Calls with it need a paid plan — get a key.
Free tier, no form to fill in. Signing in shares your email address with us — we store it to create your key and to recognise you if you sign in with another provider. See our Privacy Policy and Terms.
A second provider on the same verified email joins the account you already have.
openapi: 3.2.0
info:
title: Fulcrum Public Change Order API
version: v1
servers:
- url: https://api.fulcrumpro.com
tags:
- name: Change Order
paths:
/api/change-orders:
post:
tags:
- Change Order
summary: Create a change order.
operationId: CreateChangeOrder
requestBody:
content:
application/json-patch+json:
schema:
$ref: '#/components/schemas/ChangeOrderSaveDto'
application/json:
schema:
$ref: '#/components/schemas/ChangeOrderSaveDto'
text/json:
schema:
$ref: '#/components/schemas/ChangeOrderSaveDto'
application/*+json:
schema:
$ref: '#/components/schemas/ChangeOrderSaveDto'
required: true
responses:
'200':
description: The created change order
content:
application/json:
schema:
$ref: '#/components/schemas/ChangeOrderDto'
application/problem+json:
schema:
$ref: '#/components/schemas/ChangeOrderDto'
'400':
description: Validation issues with input
x-c4-required-permissions:
- Orders-SalesOrders-Edit Sales Order
/api/change-orders/{id}:
delete:
tags:
- Change Order
summary: Delete a change order and the tasks filed under it, with their attachments.
operationId: DeleteChangeOrder
parameters:
- name: id
in: path
required: true
schema:
type: string
responses:
'200':
description: Success
'204':
description: Change order did not exist
'400':
description: The change order has already been applied
x-c4-required-permissions:
- Orders-SalesOrders-Edit Sales Order
get:
tags:
- Change Order
summary: Get a change order by id, including the sales orders, jobs and quotes it…
operationId: GetChangeOrder
parameters:
- name: id
in: path
required: true
schema:
type: string
responses:
'200':
description: The change order for the given id
content:
application/json:
schema:
$ref: '#/components/schemas/ChangeOrderDto'
application/problem+json:
schema:
$ref: '#/components/schemas/ChangeOrderDto'
'404':
description: Change order did not exist
x-c4-required-permissions:
- Orders-SalesOrders-View Sales Order
put:
tags:
- Change Order
summary: Update a change order.
operationId: UpdateChangeOrder
parameters:
- name: id
in: path
required: true
schema:
type: string
requestBody:
content:
application/json-patch+json:
schema:
$ref: '#/components/schemas/ChangeOrderSaveDto'
application/json:
schema:
$ref: '#/components/schemas/ChangeOrderSaveDto'
text/json:
schema:
$ref: '#/components/schemas/ChangeOrderSaveDto'
application/*+json:
schema:
$ref: '#/components/schemas/ChangeOrderSaveDto'
required: true
responses:
'200':
description: The updated change order
content:
application/json:
schema:
$ref: '#/components/schemas/ChangeOrderDto'
application/problem+json:
schema:
$ref: '#/components/schemas/ChangeOrderDto'
'400':
description: Validation issues with input
'404':
description: Change order did not exist
x-c4-required-permissions:
- Orders-SalesOrders-Edit Sales Order
/api/change-orders/list:
post:
tags:
- Change Order
summary: Finds change orders based on search parameters.
operationId: ListChangeOrders
parameters:
- name: Sort.Field
in: query
description: Sort field
schema:
minLength: 1
type: string
- name: Sort.Dir
in: query
description: Sort direction
schema:
$ref: '#/components/schemas/CommonEnumSortDirectionEnum'
- name: Skip
in: query
description: 'Number of records to skip. Defaults to 0. Combine with FulcrumProduct.PublicApi.Dto.Common.PagingDto.Take to page
through a result set larger than one page.'
schema:
minimum: 0
type: integer
format: int32
- name: Take
in: query
description: 'Number of records to return. Validation accepts 0 through 5000, but `0` is not a
page size and what an endpoint does with it varies, so send a value from 1 to 5000.
Two cases differ. A request that supplies paging but leaves this field out takes this
field''s default of <b>50</b>. A request that supplies no paging at all is
endpoint-specific — some define their own fallback — so it does not reliably mean any
particular number of records. Either way the response says nothing about records it
did not return, so send this explicitly whenever the size of the answer matters.
Endpoints returning a paged envelope report `totalCount` and `hasNextPage`
alongside the records; endpoints returning a bare array report neither, so page those
with FulcrumProduct.PublicApi.Dto.Common.PagingDto.Skip until a page comes back shorter than the value requested.'
schema:
maximum: 5000
minimum: 0
type: integer
format: int32
requestBody:
content:
application/json-patch+json:
schema:
$ref: '#/components/schemas/ChangeOrdersListParameters'
application/json:
schema:
$ref: '#/components/schemas/ChangeOrdersListParameters'
text/json:
schema:
$ref: '#/components/schemas/ChangeOrdersListParameters'
application/*+json:
schema:
$ref: '#/components/schemas/ChangeOrdersListParameters'
responses:
'200':
description: The matching change orders
content:
application/json:
schema:
$ref: '#/components/schemas/DtoPagedResultDtoChangeOrderSummaryDto'
application/problem+json:
schema:
$ref: '#/components/schemas/DtoPagedResultDtoChangeOrderSummaryDto'
'400':
description: Validation issues with input
x-c4-required-permissions:
- Orders-SalesOrders-View Sales Order
components:
schemas:
CommonReferenceDto:
type: object
properties:
id:
maxLength: 24
minLength: 24
type:
- string
- 'null'
description: Unique Id associated to the referenced object
name:
maxLength: 200
minLength: 1
type:
- string
- 'null'
description: Descriptive name associated to the object
additionalProperties: false
description: Represents a reference to a document in a DB collection
DtoPagedResultDtoChangeOrderSummaryDto:
required:
- data
- hasNextPage
- hasPreviousPage
- page
- pageSize
- totalCount
- totalPages
type: object
properties:
data:
type: array
items:
$ref: '#/components/schemas/ChangeOrderSummaryDto'
description: The data
page:
type: integer
description: The 1-indexed page
format: int32
readOnly: true
pageSize:
type: integer
description: The page size
format: int32
readOnly: true
totalCount:
type: integer
description: The total count of records
format: int32
totalPages:
type: integer
description: The total pages
format: int32
readOnly: true
hasPreviousPage:
type: boolean
description: True if there is a previous page
readOnly: true
hasNextPage:
type: boolean
description: True if there is a next page
readOnly: true
additionalProperties: false
description: Paged result
ChangeOrderEnumImpactedRecordDocumentTypeEnum:
enum:
- salesOrder
- job
- quote
type: string
description: The kind of document a change order impacts.
CommonEnumSortDirectionEnum:
enum:
- ascending
- descending
type: string
description: Specify sorting direction.
ChangeOrderSummaryDto:
type: object
properties:
id:
type:
- string
- 'null'
description: The id of the change order
number:
type: integer
description: The change order's sequential number, unique within the tenant and assigned server-side
format: int32
customer:
$ref: '#/components/schemas/CommonReferenceDto'
originalRevisionItem:
$ref: '#/components/schemas/ChangeOrderItemReferenceDto'
newRevisionItem:
$ref: '#/components/schemas/ChangeOrderItemReferenceDto'
requestedUtc:
type:
- string
- 'null'
description: When the change was requested (UTC). Defaults to the moment of creation when not supplied
format: date-time
dueDateUtc:
type:
- string
- 'null'
description: When the change order is due (UTC), or null when it carries no date
format: date-time
approvedUtc:
type:
- string
- 'null'
description: When the change order was approved (UTC), or null when it has not been
format: date-time
completedUtc:
type:
- string
- 'null'
description: 'When the change order was completed (UTC). Stamped server-side when status moves to Completed
without one supplied'
format: date-time
status:
$ref: '#/components/schemas/ChangeOrderStatusEnum'
detail:
type:
- string
- 'null'
description: What the change is
disposition:
$ref: '#/components/schemas/CommonReferenceDto'
notificationsEnabled:
type:
- boolean
- 'null'
description: Whether completing a task on this change order tells the owners of the next step
createdBy:
$ref: '#/components/schemas/CommonReferenceDto'
createdUtc:
type:
- string
- 'null'
description: When the change order was created (UTC). Read-only
format: date-time
modifiedBy:
$ref: '#/components/schemas/CommonReferenceDto'
modifiedUtc:
type:
- string
- 'null'
description: When the change order was last modified (UTC); supports incremental sync. Read-only
format: date-time
additionalProperties: false
description: 'A change order row returned by the change order list: the header, without the impacted records.'
ChangeOrdersListParameters:
type: object
properties:
search:
type:
- string
- 'null'
description: 'Case-insensitive search over the customer name, the original and new revision items, and the
detail'
statuses:
type:
- array
- 'null'
items:
$ref: '#/components/schemas/ChangeOrderStatusEnum'
description: Only change orders in these statuses
customerIds:
type:
- array
- 'null'
items:
type: string
description: Only change orders raised for these customers
dispositionIds:
type:
- array
- 'null'
items:
type: string
description: Only change orders carrying these dispositions
requestedFromUtc:
type:
- string
- 'null'
description: Inclusive lower bound on requestedUtc
format: date-time
requestedToUtc:
type:
- string
- 'null'
description: Inclusive upper bound on requestedUtc
format: date-time
dueFromUtc:
type:
- string
- 'null'
description: Inclusive lower bound on dueDateUtc
format: date-time
dueToUtc:
type:
- string
- 'null'
description: Inclusive upper bound on dueDateUtc
format: date-time
createdFromUtc:
type:
- string
- 'null'
description: Inclusive lower bound on createdUtc
format: date-time
createdToUtc:
type:
- string
- 'null'
description: Inclusive upper bound on createdUtc
format: date-time
completedFromUtc:
type:
- string
- 'null'
description: Inclusive lower bound on completedUtc
format: date-time
completedToUtc:
type:
- string
- 'null'
description: Inclusive upper bound on completedUtc
format: date-time
overdue:
type:
- boolean
- 'null'
description: 'True narrows to change orders whose due date has passed and that are not Completed. False and
omitted both apply no clause — this narrows, it does not select the complement'
impactedDocumentId:
type:
- string
- 'null'
description: Only change orders impacting this sales order, job or quote
revisionItemId:
type:
- string
- 'null'
description: Only change orders whose original or new revision item is this item
modifiedAfterUtc:
type:
- string
- 'null'
description: 'Only change orders written strictly after this UTC instant. Poll with the largest
modifiedUtc you hold to pick up creates and edits; deletions do not advance modifiedUtc'
format: date-time
modifiedBeforeUtc:
type:
- string
- 'null'
description: Only change orders written at or before this UTC instant
format: date-time
additionalProperties: false
description: 'Filters for the change order list. All filters are optional and combine with AND semantics
(list-valued filters match any of their values).'
ChangeOrderItemReferenceDto:
type: object
properties:
id:
maxLength: 24
minLength: 24
type:
- string
- 'null'
description: The id of the item revision, as returned by Item List
name:
maxLength: 200
minLength: 1
type:
- string
- 'null'
description: The item's number and revision together, as the app displays it. Read-only
number:
type:
- string
- 'null'
description: The item's number. Read-only
revision:
type:
- string
- 'null'
description: The item's revision, or null when the item carries none. Read-only
additionalProperties: false
description: A reference to an item revision on a change order.
ChangeOrderSaveDto:
required:
- originalRevisionItem
type: object
properties:
customer:
$ref: '#/components/schemas/CommonReferenceDto'
originalRevisionItem:
$ref: '#/components/schemas/ChangeOrderItemReferenceDto'
newRevisionItem:
$ref: '#/components/schemas/ChangeOrderItemReferenceDto'
requestedUtc:
type:
- string
- 'null'
description: When the change was requested (UTC). Defaults to the moment of creation when not supplied
format: date-time
dueDateUtc:
type:
- string
- 'null'
description: When the change order is due (UTC)
format: date-time
approvedUtc:
type:
- string
- 'null'
description: When the change order was approved (UTC)
format: date-time
completedUtc:
type:
- string
- 'null'
description: 'When the change order was completed (UTC). Stamped server-side when status is Completed and
none is supplied'
format: date-time
status:
$ref: '#/components/schemas/ChangeOrderStatusEnum'
detail:
maxLength: 2000
minLength: 0
type:
- string
- 'null'
description: What the change is
disposition:
$ref: '#/components/schemas/CommonReferenceDto'
notificationsEnabled:
type:
- boolean
- 'null'
description: 'Whether completing a task on this change order tells the owners of the next step. Null on a
create takes the company default; null on an update keeps what the change order carries'
additionalProperties: false
description: 'The writable state of a change order. Create and update both take the whole object: update is a
full replacement, so an omitted field is cleared.'
ChangeOrderStatusEnum:
enum:
- new
- inProgress
- completed
type: string
description: Where a change order stands.
ChangeOrderImpactedRecordDto:
type: object
properties:
id:
type:
- string
- 'null'
description: The id of the impacted record
documentType:
$ref: '#/components/schemas/ChangeOrderEnumImpactedRecordDocumentTypeEnum'
documentId:
maxLength: 24
minLength: 24
type:
- string
- 'null'
description: The id of the impacted sales order, job or quote
originalRevDocumentLineId:
maxLength: 24
minLength: 24
type:
- string
- 'null'
description: 'For a sales order or quote, the impacted line item at the original revision. For a job, the
sales order line item the job was created from'
newRevDocumentLineId:
maxLength: 24
minLength: 24
type:
- string
- 'null'
description: 'For a sales order or quote, the replacement line created at the new revision when the change
order is applied; null until then'
disposition:
type:
- string
- 'null'
description: What happens to the original line when the change order is applied
rolledRev:
type: boolean
description: Whether the document now sits at the change order's new revision item
additionalProperties: false
description: 'One document a change order impacts. Read-only: the change order write endpoints ignore the
collection, which is maintained in the app.'
ChangeOrderDto:
type: object
properties:
id:
type:
- string
- 'null'
description: The id of the change order
number:
type: integer
description: The change order's sequential number, unique within the tenant and assigned server-side
format: int32
customer:
$ref: '#/components/schemas/CommonReferenceDto'
originalRevisionItem:
$ref: '#/components/schemas/ChangeOrderItemReferenceDto'
newRevisionItem:
$ref: '#/components/schemas/ChangeOrderItemReferenceDto'
requestedUtc:
type:
- string
- 'null'
description: When the change was requested (UTC). Defaults to the moment of creation when not supplied
format: date-time
dueDateUtc:
type:
- string
- 'null'
description: When the change order is due (UTC), or null when it carries no date
format: date-time
approvedUtc:
type:
- string
- 'null'
description: When the change order was approved (UTC), or null when it has not been
format: date-time
completedUtc:
type:
- string
- 'null'
description: 'When the change order was completed (UTC). Stamped server-side when status moves to Completed
without one supplied'
format: date-time
status:
$ref: '#/components/schemas/ChangeOrderStatusEnum'
detail:
type:
- string
- 'null'
description: What the change is
disposition:
$ref: '#/components/schemas/CommonReferenceDto'
notificationsEnabled:
type:
- boolean
- 'null'
description: Whether completing a task on this change order tells the owners of the next step
createdBy:
$ref: '#/components/schemas/CommonReferenceDto'
createdUtc:
type:
- string
- 'null'
description: When the change order was created (UTC). Read-only
format: date-time
modifiedBy:
$ref: '#/components/schemas/CommonReferenceDto'
modifiedUtc:
type:
- string
- 'null'
description: When the change order was last modified (UTC); supports incremental sync. Read-only
format: date-time
impactedRecords:
type: array
items:
$ref: '#/components/schemas/ChangeOrderImpactedRecordDto'
description: 'The sales orders, jobs and quotes the change order impacts; empty when it impacts none.
Read-only — create and update never write it, so a change made to it elsewhere while an update
is in flight stands'
additionalProperties: false
description: 'A change order: an item revision being replaced, and the sales orders, jobs and quotes it
touches. Its tasks are a separate resource.'
securitySchemes:
bearer:
type: http
description: Your API bearer token generated in System Data > Advanced > Public API Setup
scheme: bearer
bearerFormat: JWT
x-tagGroups:
- name: Accounting Code
tags:
- Accounting Code
- name: Alert
tags:
- Alert
- name: Attachment
tags:
- Attachment
- Attachment Certification
- name: Auth
tags:
- Auth
- name: CAPAs
tags:
- CAPAs
- name: Change Order
tags:
- Change Order
- name: Chart Of Accounts
tags:
- Chart Of Accounts
- name: Company Info
tags:
- Company Info
- name: Custom Field
tags:
- Custom Field
- name: Customer
tags:
- Customer
- Customer Address
- Customer Contact
- name: Customer Tier
tags:
- Customer Tier
- name: Department
tags:
- Department
- name: Department Shift
tags:
- Department Shift
- name: Equipment
tags:
- Equipment
- name: Equipment Downtime
tags:
- Equipment Downtime
- name: Gauge Code
tags:
- Gauge Code
- name: Grade Code
tags:
- Grade Code
- name: InProcessTrackingFieldType
tags:
- InProcessTrackingFieldType
- name: Inventory
tags:
- Inventory
- name: Inventory Event
tags:
- Inventory Event
- Inventory Event Details
- name: Inventory Lot
tags:
- Inventory Lot
- name: Inventory Transactions
tags:
- Inventory Transactions
- name: Invoice
tags:
- Invoice
- Invoice Deposit Adjustment Line Item
- Invoice Deposit Line Item
- Invoice Discount Line Item
- Invoice Fee Line Item
- Invoice Line Item
- Invoice Note
- Invoice Part Line Item
- Invoice Refund Line Item
- Invoice Shipping Charge Line Item
- Invoice Tax Line Item
- name: Item
tags:
- Item
- Item Custom Fields
- Item Customer
- Item Material Vendor
- Item PriceBreaks
- Item Routing
- Item Vendor
- name: Item Category
tags:
- Item Category
- name: Item Class
tags:
- Item Class
- name: Item Tag
tags:
- Item Tag
- name: Job
tags:
- Job
- Job Custom Fields
- Job Full Routing
- Job Part Line Item Full Routing
- Job Item To Make
- Job Item To Make Operation
- Job Message
- Job Operation
- name: Job Tracking Timers
tags:
- Job Tracking Timers
- name: Location
tags:
- Location
- name: Material
tags:
- Material
- Material Vendor
- name: Material Code
tags:
- Material Code
- name: NCRs
tags:
- NCRs
- name: Nesting
tags:
- Nesting
- name: Note
tags:
- Note
- name: Operation
tags:
- Operation
- name: Payment Term
tags:
- Payment Term
- name: Purchase Order
tags:
- Purchase Order
- Purchase Order Custom Fields
- Purchase Order Discount Line Item
- Purchase Order Fee Line Item
- Purchase Order Line Item
- Purchase Order Outside Processing Line Item
- Purchase Order Part Line Item
- Purchase Order Tax Line Item
- Purchase Order Vendor Credit Line Item
- name: Quote
tags:
- Quote
- Quote Custom Fields
- Quote Discount Line Item
- Quote Fee Line Item
- Quote Part Line Item
- Quote Part Line Item Custom Fields
- Quote Part Line Item Full Routing
- Quote Tax Line Item
- name: Receiving
tags:
- Receiving Receipt
- Receiving Receipt Line Item
- name: Refund Reason Code
tags:
- Refund Reason Code
- name: Reporting
tags:
- Reporting
- name: Sales Order
tags:
- Sales Order
- Sales Order Blanket Line Item
- Sales Order Custom Fields
- Sales Order Discount Line Item
- Sales Order Fee Line Item
- Sales Order Line Item
- Sales Order Part Line Item
- Sales Order Part Line Item Custom Fields
- Sales Order Part Line Item Full Routing
- Sales Order Refund Line Item
- Sales Order Shipping Charge Line Item
- Sales Order Tax Line Item
- name: ScrapReport
tags:
- ScrapReport
- name: Settings
tags:
- Settings
- name: Shape Code
tags:
- Shape Code
- name: Shipment Line Items (V3)
tags:
- Shipment Line Items (V3)
- name: Shipment
tags:
- Shipment Custom Fields
- name: Shipments
tags:
- Shipments
- name: Shipping Method
tags:
- Shipping Method
- name: Tag
tags:
- Tag
- name: Task
tags:
- Task
- name: Tax Rate
tags:
- Tax Rate
- name: Time Clock Timers
tags:
- Time Clock Timers
- name: Timer
tags:
- Timer
- name: Tool
tags:
- Tool
- name: Tool Calibration
tags:
- Tool Calibration
- name: User
tags:
- User
- User Status
- name: Vendor
tags:
- Vendor
- Vendor Address
- Vendor Contact
- name: Work Order
tags:
- Work Order
- name: WorkCenter
tags:
- WorkCenter
x-provenance:
method: harvested
publisher: Fulcrumpro
source: https://api.fulcrumpro.com/swagger/v1/swagger.json
note: split by refine-openapis from the provider's own published document, verified by fetch (openapi/_original/*.fetch.json);
stamped by stamp-openapi-provenance.py (roadmap#793)