Palo Alto Networks Schedule connector upgrade
Schedules a software upgrade for a specific ZTNA connector. The upgrade can be scheduled for immediate execution or for a specified maintenance window. During the upgrade, the connector briefly disconnects; traffic is routed through other connectors in the same group if available.