Oracle Primavera scores 47.5/100 (Developing), with an agent readiness of 36/100 (agent ready). Scored 2026-11-28 on rubric v0.30.0. Paste one of these and it stays current on its own.
<!-- Kin Score · API Evangelist -->
<a href="https://apis.io/providers/oracle-primavera/"
title="Oracle Primavera on APIs.io — API discovery and ratings">
<img src="https://apis.io/badge/oracle-primavera.svg"
alt="Oracle Primavera Kin Score — API readiness rating by API Evangelist" width="150" height="150" loading="lazy">
</a>A plain <a> wrapping an <img>. The link is real HTML — a crawler that never runs JavaScript still sees it, which is the whole point.
The badge is a picture of Oracle Primavera's provider page, where every facet and dimension is itemised with what earned the points. If you want to move it, that page is where to look — and the machine-readable form is here:
https://apis.io/badge/oracle-primavera.jsonAll the shapes, parameters and caching rules →