# Oracle Primavera Resource Assignments API

**Canonical:** https://apis.io/apis/oracle-primavera/oracle-primavera-resource-assignments-api/  
**Provider:** Oracle Primavera — https://apis.io/providers/oracle-primavera/  
**Base URL:** https://{host}/p6ws/rest/v1  
**Documentation:** https://docs.oracle.com/en/industries/construction-engineering/primavera-gateway/index.html

Oracle Primavera Resource Assignments API is one of 9 APIs that [Oracle Primavera](https://apis.io/providers/oracle-primavera/) publishes on the [APIs.io](https://apis.io/) network, described by a machine-readable OpenAPI specification. Tagged areas include Resource Assignments. The published artifact set on APIs.io includes an OpenAPI specification, API documentation, an API reference, and a changelog.

Resource assignment operations

## Operations (1)

| Method | Path | Summary |
|---|---|---|
| GET | `/resourceassignments` | List resource assignments |

## Machine-readable artifacts (4)

- **OpenAPI** — https://raw.githubusercontent.com/api-evangelist/oracle-primavera/refs/heads/main/openapi/oracle-primavera-resource-assignments-api-openapi.yml
- **Documentation** — https://docs.oracle.com/en/industries/construction-engineering/primavera-p6-project/index.html
- **Reference** — https://docs.oracle.com/cd/G48897_01/index.htm
- **ChangeLog** — https://docs.oracle.com/cd/E64687_01/EPPM/EPPM_CFO.html

## Other Oracle Primavera APIs (8)

- [Oracle Primavera Gateway Integration API](https://apis.io/apis/oracle-primavera/oracle-primavera-gateway-integration-api/)
- [Oracle Primavera Analytics API](https://apis.io/apis/oracle-primavera/oracle-primavera-analytics-api/)
- [Oracle Primavera P6 Scheduling API](https://apis.io/apis/oracle-primavera/oracle-primavera-p6-scheduling-api/)
- [Oracle Primavera Activities API](https://apis.io/apis/oracle-primavera/oracle-primavera-activities-api/)
- [Oracle Primavera Baselines API](https://apis.io/apis/oracle-primavera/oracle-primavera-baselines-api/)
- [Oracle Primavera Projects API](https://apis.io/apis/oracle-primavera/oracle-primavera-projects-api/)
- [Oracle Primavera Resources API](https://apis.io/apis/oracle-primavera/oracle-primavera-resources-api/)
- [Oracle Primavera WBS API](https://apis.io/apis/oracle-primavera/oracle-primavera-wbs-api/)

## Tags

Resource Assignments

---

Profiled by [API Evangelist](https://apievangelist.com) and published on [APIs.io](https://apis.io/apis/oracle-primavera/oracle-primavera-resource-assignments-api/). The API's provider profile, Kin Score and agent-readiness rating are at https://apis.io/providers/oracle-primavera/.
