# Delta Exchange Orders API

**Canonical:** https://apis.io/apis/delta-exchange/delta-exchange-orders-api/  
**Provider:** Delta Exchange — https://apis.io/providers/delta-exchange/  
**Base URL:** https://api.india.delta.exchange/v2  
**Documentation:** https://docs.delta.exchange/

Delta Exchange Orders API is one of 18 APIs that [Delta Exchange](https://apis.io/providers/delta-exchange/) publishes on the [APIs.io](https://apis.io/) network, described by a machine-readable OpenAPI specification. Tagged areas include Order. The published artifact set on APIs.io includes an OpenAPI specification and API documentation.

Placing Orders, Cancelling Orders, Placing batch orders, Cancelling batch orders, Get Open orders, Change Orders Leverage. Rate limits have been introduced recently that allows only set number of operations inside a matching engine in a timeframe. The current rate limits is 500 operations/sec for each product. For ex - placing 50 orders in a batch is equivalent to 50 operations as these orders will be processed by matching engine. Rate limits do not apply when cancelling orders.

## Operations (16)

| Method | Path | Summary |
|---|---|---|
| POST | `/orders` | Place Order |
| DELETE | `/orders` | Cancel Order |
| GET | `/orders` | Get Orders |
| PUT | `/orders` | Edit Order |
| DELETE | `/orders/all` | Cancel all open orders |
| POST | `/orders/bracket` | Place Bracket Order __DEPRECATED__ |
| PUT | `/orders/bracket` | Edit Bracket order |
| POST | `/orders/batch` | Create batch orders |
| PUT | `/orders/batch` | Edit batch orders |
| DELETE | `/orders/batch` | Delele batch orders |
| POST | `/orders/leverage` | Change order leverage |
| GET | `/orders/leverage` | Get order leverage |
| GET | `/orders/{order_id}` | Get Order by id |
| GET | `/orders/client_order_id/{client_oid}` | Get Order by client oid |
| POST | `/products/{product_id}/orders/leverage` | Change order leverage |
| GET | `/products/{product_id}/orders/leverage` | Get order leverage |

## Machine-readable artifacts (2)

- **OpenAPI** — https://artifacts.apis.io/delta-exchange/openapi/delta-exchange-orders-api-openapi.yml
- **Documentation** — https://docs.delta.exchange/

## Other Delta Exchange APIs (12)

- [Delta Exchange MCP Server](https://apis.io/apis/delta-exchange/delta-exchange-mcp/)
- [Delta Exchange Account API](https://apis.io/apis/delta-exchange/delta-exchange-account-api/)
- [Delta Exchange Assets API](https://apis.io/apis/delta-exchange/delta-exchange-assets-api/)
- [Delta Exchange Heartbeat Management API](https://apis.io/apis/delta-exchange/delta-exchange-heartbeat-management-api/)
- [Delta Exchange Historical OHLC Candles/Sparklines API](https://apis.io/apis/delta-exchange/delta-exchange-historical-ohlc-candles-sparklines-api/)
- [Delta Exchange Indices API](https://apis.io/apis/delta-exchange/delta-exchange-indices-api/)
- [Delta Exchange MMP API](https://apis.io/apis/delta-exchange/delta-exchange-mmp-api/)
- [Delta Exchange Orderbook API](https://apis.io/apis/delta-exchange/delta-exchange-orderbook-api/)
- [Delta Exchange Positions API](https://apis.io/apis/delta-exchange/delta-exchange-positions-api/)
- [Delta Exchange Products API](https://apis.io/apis/delta-exchange/delta-exchange-products-api/)
- [Delta Exchange Settlement Prices API](https://apis.io/apis/delta-exchange/delta-exchange-settlement-prices-api/)
- [Delta Exchange Stats API](https://apis.io/apis/delta-exchange/delta-exchange-stats-api/)

## Tags

Order

---

Profiled by [API Evangelist](https://apievangelist.com) and published on [APIs.io](https://apis.io/apis/delta-exchange/delta-exchange-orders-api/). The API's provider profile, Kin Score and agent-readiness rating are at https://apis.io/providers/delta-exchange/.
